My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1934 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
1934
>
1934 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 5:42:07 PM
Creation date
2/20/2017 5:41:43 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1934
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,' 1 <br /> MW <br /> C� Pe�o� JN 95068 <br /> February 20, 1995 Page 4 <br /> We recommend erecting a construction tence at the crest of the slope to prevent <br /> disturbance on the steep bank during clearing, toundation construction, and earthwork. If <br /> the vegetation Is mainta�ned, the impact of this project on the stability of the slope should be <br /> negligible. No soil or debris should be placed on the slope, or between the structure and <br /> the slope's crest. Water trom downspouts or impervious surfaces should not be discharged <br /> onto the steep slope or near its crest. It would be preferable to discharge this water to <br /> either a storm sewer or?he base of the slope. <br /> A representative of Geotech Consultants, Inc. should observe the footing excavations and <br /> drilled pier installation. <br /> ['o�ntlonel Foyndallons <br /> Portions oi the structure located more than 15 feet trom the steep slope can be supported <br /> on conventionel footings bea�ing directly on medium-dense to dense, native soils. Continu- <br /> ous and isolated footings should have minimum widths of 12 inches and 16 inches, respec- <br /> tively. The footing subgrade must be cleaned of loose or disturbed soil prior to pouring <br /> concrete. Depending upon site and equipment constraints, this may require removing the <br /> disturbed soil by hand. If overexcavation is necessary to extend through any loose native or <br /> fill soils, the overexcavation can be filled with compacted crushed rock or lean cencrete. If <br /> crushed rodc is used, the overexcavation should be as wide as the footing width plus the <br /> depth of overexcavation. <br /> Footings constructed according to the above recommendations may be designed for an <br /> allowable soil bearing pressure of 2,000 pounds per square foot (psf). A one-third increase <br /> in this design bearfng pressure may be used when considering short-term wind or seismic <br /> loads. For the above design criteria, it is anticipated that the total post-construction settle- <br /> ment of footings tounded on competent, native soils will be about one-haH inch. <br /> Lateral loads due to wind or seismic forces may be resistsd by friction between the founda- <br /> tions and the bearing soils. We recommend using an allowable coefticient of friction equal <br /> to 0.30 for the toundation's resistance to lateral loading. <br /> Drilled Goncrete Piers <br /> Drilled, concrete-filled piers should be used to support the structure within 15 teet of the <br /> steep slope. Based on our prevlous test pit findings and installation of adjacent foundation <br /> pfers, it appears that the piers can be constructed by open hole methods. These piers <br /> should be drilled with convenilonal auger drills, but the drilling co�tractor should have <br /> GiiO'I71CII CONSUI:I'AN'IS.IN('. <br />
The URL can be used to link to this page
Your browser does not support the video tag.