Laserfiche WebLink
PUBI IC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #G01. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all ;ooftop downspouts to the side sewer. <br /> 7. Connect rooflop downspouts 10 the drainage system provided for tl,is lot. <br /> 8. Roo(top runoff must be discharged to a roof downspoul infiltration system per Cily of Everetl Slorm <br /> Manual 3-2.G.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See altachment for <br /> more details. <br /> 9. The conlrar,tor must meet wilh lhe Public Works Inspector lo discuss potenlial drainage rouling prior to <br /> beginning the projecl. <br /> 10 Install erosion conlrol measures as determined by lhe Public Works inspector, such as sill fence, slraw <br /> bales, swales,or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Slandards for small parcels <br /> 12. Remove erosion controi measures upon complelion of lhe project prior lo final approval of the permit. <br /> 13. All excavated material from foundalion, sidewalk and driveways shall be hauled to an approved, <br /> permitled site. No wasling of material is allowed on ihis building bl. <br /> 14. No dirl, mud, rocks or debris lo be lracked onto roadway. <br /> �� ,�3CLE�/ <br /> 15. No buildinc� materials lo be stacked o i s andsidewaIlcs to be kept clean and open (or <br /> �ec#e3stfien travel. <br /> �/�N i�i_E <br /> 16. Adjusl waler meler box 1"above sidewalk grade, <br /> 17. Remove and replace curb, gulter ar.i si�7c„ „'< r i�er City of [verelt Standard Plan #'s 305A 8 306 on <br /> lhis proposal's frontage as direcled o the Pub�ic 4'�urks Inspector(i.e. all unused driveways and any <br /> broken or damaged area musl be rep:� r�; <br /> 18. Install a Type I concrete driveway per Cily of[verett Slandard #307. <br /> ,�1�LE�h <br /> 19� Pave driveway from the f�ut property line oul to the sko� paving. <br /> 20. Contact the Waler Districl for connecting provisions for Ihis building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 with a gas trap per Slandard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be inslalled, lhe pressure line musl discharge into a privale manhole, then <br /> gravity flow across fhe public right-of-way. <br /> 23. A sprinkler syslem is required tor this building in compliance with lhe requirements of NFDA Slandards <br /> 13D. <br /> ��� <br /> c�,r,,:,�c���t; � <br />