My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
2026
>
2026 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 6:01:29 PM
Creation date
2/20/2017 6:01:22 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2026
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � <br /> Su6surface Ezploration nnd � <br /> 2026 Grand Avenue Geotechnical Engineering Repon <br /> Evererr Nashin¢ron Design Recommendatians <br /> footing drain system, but should be collected by a separate tighdine drain leading to an � <br /> established storm ��arer collection system. In planning, exterior grades adjacent to walis i <br /> should be sloped do���mvard away from the structures to achieve surface drainage. j <br /> � <br /> 13.0 PROJECT DESIGN AND CONSTRUCTION MONITORING ' <br /> We recommend that AESI perform a geotechnical review of the design and construction ! <br /> documents. In this way AESI can verify that our recommendations have been incorporated <br /> into the design. In addition, AL-SI should be consulted to provide recommendations for <br /> construction of temporary or permanent shoring walls. Revie�v of plans and specifications is <br /> no[ part of the current scope of work and budget. <br /> �Ve are available to provide eeotechnical eneineering and monitoring services durine <br /> construction. The inteeriry of the foundations depends on proper site preparation and <br /> construction procedures. In addition, engineering decisions may have to be made in the field <br /> in the even[ that variations in subsurface conditions become apparent. <br /> We have enjoyed working with you on this study and are confident that these recommendations <br /> will aid in the successful completion of your project. If you should have any questions, or <br /> require further assistance, please do not hesitate to call. <br /> Sincerely, <br /> ASSOCIATED EARTH SCIENCES, I\C. <br /> Kirkland, �i�asl�ington " <br /> ��V A <br /> h•�`OF R'AS/iGMli <br /> ,�� �c <br /> ,�'�� n <br /> �� �a. :. � a° <br /> C/-ku�{��Clare, E.I.T. ✓� crs�-,:�o : ,r �, <br /> Senior Staff Engineer �on�u.�:`{ �' <br /> J1tt' <br /> i <br /> �:cs. : � J✓ I <br /> .__J <br /> Jo Sonder aard, P.G. �tatthew A. tifiller. P.E. <br /> : ociate Geolo�ist Senior Project Eneineer <br /> Att�chments: Pigure i Vicinitv \tap <br /> Figure 2: Site and Lxploration Plan <br /> Appendix: Explo�atior ` oes <br /> �;i17e ;� _„�,n EXH I BIT # ASSOG�ITED EAR7N SClENCEs, �,vc. <br /> ,��s.�- KE�a��tv�c, -�-o�,Qa�b-�-�K PAGF ��nF �`� Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.