My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2030 GRAND AVE 2018-01-01 MF Import
>
Address Records
>
GRAND AVE
>
2030
>
2030 GRAND AVE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2019 3:26:14 PM
Creation date
2/20/2017 6:05:13 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2030
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Pueuc WOFucs DFrnRRrr.+Fxr <br /> . Utili6es Division,3200 Cedar Street <br /> Everett WA 98201 <br /> 425-257-88(10 <br /> Receipt �l Date Paid ��- 30-�G^ <br /> Cost of Work Order Work OrderJl <br /> � Cost of Service Order 15,261.00 Service Order# ��C�� (,�(�//-Qa;. <br /> Cont�ct Pcrson Telephone q 425 218-1822 <br /> Itequcsted T3y Gordon Witcher Date of Request 11-9-06 <br /> Property Owncr(name) Christiansen Qualiry Homea <br /> Chargc Cost to(name if�lif(erenl ihan owner) <br /> Address 2030 Rucke�Ave Ciry Everett Zip 98201 <br /> Installalion Location 2030 Cii80c� AVe <br /> i„ti�all,�io„ ty���/d�sa;,��ion/s;�ej���. #4-4" fire service, DCDA in vault. Expose main on E side <br /> Gran�i. Make hot tap. Trench across Grand to west side, ipafsU�xault-awd-96Bk, plumb to �rop line <br /> — ' <br /> �f �i — �d , � �SS� <br /> ❑ The following cstimate is bascd upon Uic Ulilities Division providing all labor,equi c� <br /> materials,restoration,and final hook-up. <br /> Picase noiif�fhc Ci�of Evcrcit Utilitics Division 10 working days in advance of required instaIlation <br /> date to allow for scheduling and parts procuremenl <br /> Whenever the eslimaled mst is not sufficient lo cover the total expense far IaUor,material,equipmeN rental and <br /> administrative costs, Ihe deficil shall be charged lo Ihe property for which such installation was made and Ihe <br /> owncr thercof, and provided (udher, lhat any �xcess payment shall bc retumed to the person applying for the <br /> inslallalion. <br /> "Deposil must be paid prior tu ordcring parts or scheduling wark. <br /> WATF.R METERS 3" AND LARGER MAY HAVF, A SIX TO 10 WEEK LEAD TIME. <br /> cc Bldg. Pcrmit Centc� <br /> nlatcrial 6,442.00 Mark Sadler <br /> Kirk 13moks <br /> l.abor and I3cnclils 6,996.00 Gordon 1'Vitdicr <br /> I:quipment Ken�al 1,558.00 Robert\Naddle <br /> Malt Welborn <br /> 1'as 263.00 BenJ�am Stephanos <br /> 'POTN. 15,261.00 Gcrr�Crum <br /> — Dennis Roberson <br /> Prcp,urd b��: Gerry Crum ����"-9�itc Estitnalc Prcparcd 11-21=-6 <br /> Acccpted by: Rcprescnting <br /> F.STIDtATF GOOD FOR 6 n10NTHS <br /> ti ti-��m���,��o-���.rcmi�,crh��.r,.�.mu�m.,ixH' 3 of Q <br /> -�'1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.