Laserfiche WebLink
CL088D Cli 1fO:t1C ORDERB RBPORT <br /> Total Utility Maintenance Management System <br /> 01/27/1997 Paqe 2 <br /> :accsssa=zxvaaax�a=acc-asvc cv'e==c=ecva�ove'vice=eecc=ovesveo=e==masavc�usa�a <br /> Date Ranqe :O1/09/1989 - O1/09/1997 <br /> CM Work Order Ranqe :1001091070001 - UT2600-02- Pattern :7101096750264 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Proqzam ALL Function ALL Activity ALL <br /> �a:s:aassesssaasssas:�a:sxae===eeveaveeecce====�v--vvose====e�smvsess::zsx:ssas <br /> CM WORK ORDER ID: 7101096750264 (continued) <br /> V2083 91 DODGE 1/2 TON 1.00 4.42 <br /> V2152 87 DODGE W/HOIST 20.00 96.00 <br /> V3603 86 CASE BACKHOE 780 20.00 792.00 <br /> V6807 89 COMPRESSOR IR 20.00 96. 00 <br /> VH0002 1993 VACTOR 1.00 51.90 <br /> VJ0002 93 INTERNATIONAL 10 YD 20.00 428.00 <br /> VJ0005 '95 FORD 1.5 YARD 2.00 19.40 <br /> VJ0019 '96 FORD 1 TON 1.00 5.90 <br /> Total Vehicle Cost: 1509 82 <br /> Work Description: <br /> -----------------------------------------•--------------------------------------- <br /> REIFORCED SIDE SEWER FROM 30" CLAY MAIN TO PROPERTY LINE- INSTALLED <br /> CLEANOUT IN SIDEWALK MAIN AT 9 � DEEP STATIONING SAME AS BEFORE, 4 + 76 FEET. <br /> Total cost for work order 7101096750264: 3178 34 <br />