Laserfiche WebLink
Door installation <br /> Weather I3arri�r <br /> Siding <br /> Other exterior 1lashing details <br /> Deck flashing and rails <br /> RooP ilashing <br /> I�xterior peneU•ations <br /> Windows (Milt���.r� <br /> Window installution ���as inspcctcd lor nailing and installation per product <br /> manufacturcr's specifications. <br /> nll areas inspected �verc obsrrved to be complcted �vith no outstanding <br /> correction items. <br /> Doors: <br /> Door installation �vas inspected lor installation per product manufacturer�s <br /> and builder's spccifications. Sills �vere inspected for correct sealing ngainst <br /> �vatcr intrusion. <br /> All arcas inspccted wcrc obscrved to hc complctcd with no outstanding <br /> correction items. <br /> VVe•�ther barricr (I�orti I ibcr Jumbo 'l�cz): <br /> The wcathcr barricr material was inspected for installation to manulacturcr's <br /> spccilications and building code. <br /> "I'hc weathcr barricr �a�as inspectcd to assure no tears, gaps or missing areas. <br /> Inspections �vere perf'ormed li�r correct overlap of matecial and sealing of all <br /> penetrations. <br /> All areas inspcctcd were observed to bc completed with no outstanding <br /> COI'I'CC11011 I 1CI17S. <br /> I�lashin� (VVaterUlock): <br /> Window flashing was inspected for correct application ol�material per <br /> product manufactw•cr's recommendations, builder's specitications and good <br /> indusU•y standards. Flashing was installed before �vindow installation using <br /> thc spcciticd VVatcrblock tlashing "system". <br /> / `� <br />