My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2122 GRAND AVE 2018-01-02 MF Import
>
Address Records
>
GRAND AVE
>
2122
>
2122 GRAND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2022 10:35:51 AM
Creation date
2/20/2017 6:23:30 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2122
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> i PUBL/C /�VO/�XS <br /> , ; . <br /> ;b; �r <br /> December 9. 1998 �(�5 e ��.Q Q �.Qc.J <br /> p�ca� ��,� �-G�c r�_ra•�� <br /> hfcl Barringer � ����� �.r� <br /> 2122 Grand Ar•enue 1 <br /> Everett, WA 98201 —(� a ��� Ze 3o+µ1 -�` T�` �� <br /> Subject: Project: Barringer � � s �Nvs �� • <br /> Job Address: 23-Grand Avenue �t,� M� j��d,,,� �,�1�i�� <br /> ' Plan Check No.: 60845 ? - � <br /> , � o w� Y n�,. . <br /> Dear Mr. Barringer: ���„�k.,s� �,�L <br /> [n response to your application for a construction permit, your planc have bee� esa.^.:ihed :end •;o:: sr^. <br /> auvised [hat tne issuance of a permit is being withheld for the reasons listed below. These comments <br /> address building issues only, additional rev�s�ons or additions may be required by other departments <br /> amendcd byt�the Sta ef of Wash'ngton�and oIr Washi gton StatetEnergy C�ode 1997�EdB o�n�unl ss stated <br /> othcrwise. <br /> In order for the processin� of xour application to continue, it will be necessary to <br /> provide the Buildmg Divis�on w�th two complete new sets of drawings retlecting the <br /> corrections requested. <br /> 1. Plans do not show how addition (sun room) complies with Washington St�te i�nergy Code <br /> (WSEC). Provide WSEC compliance forms. <br /> �2, tiliow load path of Simpson HDSOA holddowns to foundation. <br /> �3. Provide lateral analysis and gravity load calculations that were prepared by your engineer. <br /> 4. Providc safety glass in required hazardous locations, per 240G UBC. Sqow on plans. <br /> 'S. Provide at Icast two clevation vicws of the structure (side and rear). <br /> "6. Pruvide section vicw� of "half-w.ill guardrail". <br /> 7. Provide stnoke detect�rs in all clrrPirtg roen:s ar.d in the carridcr or ar:.a g��'ing ac�ess to <br /> cach separate sleeping arca. Detectors shall be installed on each floor and in basements. <br /> Preparc a response lctter showing where cech item in this corrcction letter is addressed on the plan set. <br /> Upon resuUmittal of the drawings, your application will be given priority and plan review will <br /> rccommcncc. <br /> All required submivals shall be of sufficient detail and contain sufficicnt information to ensure that thc <br /> proposcd slrucuire will be constructed in compliance widt all adopted codcs. <br /> ; Sinccrcly <br /> i ���7�,�� - <br /> � Jeff ieilman � <br /> Devclopment Technician <br /> ni,w>�i�rm�.n • <br /> CITY OF EVERETT• 3200 Cedar Street • Everett.WA 98201 • (425)257-8a00• Fax(425)257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.