Laserfiche WebLink
i <br /> i <br /> � <br /> i <br /> I <br /> everett INSPEC°TION REPORT <br /> e �.� o �� � <br /> Addres <br /> Contractor � <br /> Owner '� , <br /> Date �- /3 - 9° <br /> TYPE OF INSPECTION REGIUESTED <br /> ❑ BLDG: Pmt. No.._--� MECH: Pml No. _- � <br /> �EC: Pmt. No. � �a/� ❑ PLBG: Pmt. No. _---- <br /> ❑Temp. Elect. � Framing ❑ Gas Pipin9 <br /> ❑ Footing ❑ Drywall, Nailing ❑ ConsultaUon <br /> ❑ Foundation ❑ Shear Nailing ❑ Groundwork <br /> O Ductwork ❑ Grid ❑ St ct.Slab <br /> ❑ Rough•In ��3� <br /> ❑Wood Stove �e�,ice � "�r� �--- <br /> ❑ Masonry <br /> [�APPROVAL � PARTIAL APPROVAL ' <br /> ❑ VIOLATION O CORRECTION REQUIRED <br /> ❑ Corrections listed below MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appointment. <br /> p Was not able to peAorm inspection. <br /> ❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES PRIOR TO OCCUPANCY. <br /> � � .. � ,� <br /> 1, c =2ii�c� <br /> L (. �(�– <br /> i <br /> � ____Date �, v <br /> Inspector �- <br /> I <br />