Laserfiche WebLink
FOR OFFICE USE ONLY <br /> ADDRESS <br /> (1) BUILDING PERMIT FEE <br /> $ <br /> (A) PLAN CHECK FEE <br /> (2) PIUMBING <br /> (3) MECHANICAL <br /> (4) STATE SURCHARGES <br /> (A) BUILDING CODE <br /> (B) ENERGY CODE <br /> (5) DRIVEWAY PERMIT <br /> $ <br /> (6) WATER SERVICE TO BE PAID PRIOR TO BUILDING PERMIT ISSUANCE $ <br /> (A) TO BE DETERMINED BY BLDG. INSPECTOR INCH <br /> (B) EXIST. WATER SERVICE.APPLICATION NO. <br /> (7) STATUS OF SEWER CHARGES: <br /> BOND DISTRICT FOOTAGE <br /> N, S, E, W <br /> SYSTEMS DEVELOPMENT <br /> WATER <br /> SEWER � <br /> TOTALORD. FEE <br /> SEWER CONNECTION CHARGES <br /> YEAR TRUIVK $ , <br /> LATERAL <br /> TOTAL CONNECTION CHARGES $ <br /> SEWER PERMIT FEE g <br /> �GGs�'��% � � <br /> y7.� <br />