Laserfiche WebLink
. • � <br /> �. <br /> Ltr. J. Pyle (B0210-027) <br /> OctoEer 28, 2002 <br /> Page 2 <br /> 4. The following relates to the mof overhangs on the south side of the building: <br /> a. The maximum distance the overhangs R�ay extend beyond the wall is l2". <br /> Section 503.2.1 <br /> b. The overhang must be of minimum one-hour construction or heav.y- <br /> timber. Section 705 <br /> 5. The new roof adds additional mass and elevation (sail a�ea) to the structure. <br /> Structural calculations must be provided which show compliance with current <br /> lateral loading requirements. <br /> Please prepare a response letter showing where each item in this cortection letter is <br /> addressed on the plan set. <br /> Upon resubmission of the drawings, your application will be given priority and Fdan <br /> review will recommence. <br /> All required submittals shall be oF sufficient detail and contain sufficient info�mation to <br /> ensure that the proposed structure wilf be constructed in compliance with all adopted <br /> codes. <br /> Sincerely, <br /> � �_- <br /> To R. Lee <br /> Plans Examiner <br /> � <br />