My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2420 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
2420
>
2420 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 7:16:14 PM
Creation date
2/20/2017 7:15:25 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2420
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 1 I <br /> D�\..RMINATION OF NON-SIGNIFI��,NCE <br /> SEPA #39-90 <br /> DESCRIPTION oF PROPOSAL: The proposeZ action is for the issuance of <br /> Building and Public Works permits to allow for the construction of a <br /> three story, nine unit apartment building 10 ,800 square feet in size <br /> on a 6,000 square foot site. <br /> PROPONENT: Reid Shockey <br /> 2924 Colby Avenue <br /> Everett, WA 98201 <br /> IACATION: West side of the 2400 Block of Grand Avenue. <br /> ZONING: R-5 , Core Residential <br /> Lead Agency: City of Everett Planning Department <br /> Contact Person: Steve Ingalsbe Phone: 259-8731 <br /> MITIGATION MEASURES: <br /> The following requirements listed below are placed in response to our <br /> review of the environmental checklist and site plan. <br /> AGENCIES WZTH JiJRISDICTION: None <br /> MITIGATION REQUIRED BY SEPA: <br /> 1. Any grading/fill on this site shall be done so as to not impact <br /> the surrounding properties. <br /> MITIGATION REQUIRED BY EXISTING CODES AND ORDINANCES: <br /> 1. The driveways on Grand Avenue must be removed and replaced <br /> with curb, gutter, sidewalk per City Standards. Any broken or <br /> damaged sidewalk shail be repaired/replaced per the City <br /> Public Works Inspector. (SEPA Transportation Policies) <br /> 2. The alley must be paved per City Design Standards from 25th <br /> Street to the north property line of the project. (SEPA <br /> Transportation Po� ?.cies) <br /> 3 . Special charges for connection to the sewer and water systems <br /> in accordance with ordinance 1171-85 are applicable. The <br /> actual cost shall be computed 'uy the Building Department per <br /> the ordinance in effect at the time and according to the <br /> information provided on the approved plans on the date of <br /> permit issuance. (SEPA Public Services and Utilities Policies) <br /> . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.