My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2420 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
2420
>
2420 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 7:16:14 PM
Creation date
2/20/2017 7:15:25 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2420
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Publk Worke Departmeet <br /> COST ES'CIl�IATE SHEET j� UdBtla Divbioa <br /> 3200 Cedar Street <br /> �u�n� Eventt,Wuhingtoa 98201 <br /> L/�'� (206)259.8800 <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order # <br /> X Cost of Service Order 58,917.00 Service Order# <br /> Contact Person Stan Strickland Telephone # 793-2326 <br /> Requested By Gordon Witcher Date of Request 10/30/96 <br /> Property Owner(name) Edmonds Building Co. <br /> Charge Cost to(name if different than owner) <br /> Addrcss 847 Dayton Ciry Edmonds Zip 98020 <br /> Installation Location 2420 Grand Ave. <br /> Installation rype/description/size/etc. Expose 3"main, insert tee, increase to 4", set vault, install DCDA. Hot tap 3" <br /> for 2"domestic, restore area.• <br /> � The following estimate is based upon the. Utilities Division providing all labor, equipment, materiels, <br /> restoration,and final hook-up. <br /> ❑ The following estimate is based upon the Street Division work group providing all lebor,equipment, <br /> materials and restoration to property. <br /> �e notiPo the Citv of Eventt UtiliNes Division 10 workina davs in odvae ���reuuircd inmll�tir��e.�te to <br /> ow far uhedulin¢aod parb urocurement <br /> Whenever the estimated cost is not sufficient to cover the total expenx tor labor, material, equipment rcntal rnd <br /> administrative costs, the deflcit sArll be charged to the property for whlch such installrtion was made and the owner <br /> thereof,and provided further,thrt any ezcess payment sh�ll be returned to the person applyiog tor the installation. <br /> Itemized Cost Estimate: • <br /> cc: Bldg. Permit Center <br /> Labor 8c Benefits $3,240.00 Clair Olivers . <br /> Material $3,692.00 T'om Thetford <br /> Kirk Brooks <br /> Equipment Rental $1,332.00 Gordon Witcher <br /> Dan Lowell <br /> Surface Restoration — Stan Mitchell <br /> Sales Tax $653.00 Paul McKee <br /> Gerty Crum <br /> TOTAL $8,917.00 <br /> •NOTE: This quote supercedes 10-9-95 quote for S 14,064.00 due to change in <br /> flow requirements. <br /> Prcpared by: Gerty Crut Date Est. <br /> Accepted by: Prenarcd: Representing: <br /> 10/31/96 <br /> ESTIMATE GOOD FOR 6 MONTNc <br /> cosrncrm ccoxonsoiamm�r <br /> CENTRAL RECORDS <br />
The URL can be used to link to this page
Your browser does not support the video tag.