My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2804 GRAND AVE SNO ISLE CO OP 2018-01-02 MF Import
>
Address Records
>
GRAND AVE
>
2804
>
SNO ISLE CO OP
>
2804 GRAND AVE SNO ISLE CO OP 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2023 2:12:45 PM
Creation date
2/20/2017 8:10:08 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2804
Tenant Name
SNO ISLE CO OP
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. ^O" ST 'Q('TION D MEWS <br />Three (3) complete sets with site plans. Minimum scale: 118" = 1'-0". <br />All projects 000 square feet re more licensed to practice <br />A. Architect's stamp lxns to be preparedb an architect currencysneer's stamp <br />units require the pplease note that an crag <br />in the state of WashingtonRCWt18 8) <br />does not eliminate this req showing all exit <br />B. Floor plan with complete ' dimensions (indicate entire building <br />doors, stairs, corridors, etc.). <br />C. Building section with vertical dimensions indiclting location of tenant <br />improvement, other tenants and building construction, on and assembly rating as required <br />D. Wall sections indicating proPos�tion orubuildi g construchon. <br />for occupancy separation, area seP <br />Sec ons. <br />N� <br />A plans (1/4" = 1'-0" minimum scale) a° accessories (f required) and <br />F. Toilet room <br />H,�l and floor finishes, fixture dimensions, handicap <br />toilet accessories. <br />and door rating, type of lock or latch and signage <br />G. Door schedule (indicate frame <br />if required). <br />Jan and energy budget calculations (indicate <br />or revised)- of This must be <br />IVA H.include <br />Lighting p mounted lighting <br />include exterior building • permit application. <br />provided provided at the time of building pe buildings must be <br />exterior wall or roof remodeling. Cavity must be <br />�+ /t I. Energy calculations framing cavity is expo energy <br />insulated when the framing depth possible or to the depth indicated by gy <br />insulated '�o the maximum dep <br />calculations)• existing structure <br />�i j. structural drawings and calculations (only required if altering <br />or adding new load -bearing <br />K. Copies of any permits/apProvals issued by the Planning Department. <br />,,, m,k- June 30, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.