Laserfiche WebLink
�� <br />cr.osso cx woxx oxn�s nsroitm <br />Total Utility Maintenance Management System <br />O1/02/1998 Page 1 <br />Date Ranqe :O1/09/1989 - 01/O1/1998 <br />CM Work Order Range :0810800810000 - UT2830-30-322Pattern :7101196751333 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program �.LL Function ALL Activity ALL <br />CM WORK ORDER ID: 7101196751333 Title: <br />«DUPLICATE PRINTING OF THIS WORK ORDfiR» <br />Item ID: W53095G071 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 <br />Date Completed: 12/31/1997 <br />Overall Craft: <br />Issued: 12/29/1997 <br />Out of Service? No <br />Meter Reading: <br />Downtime: 0 hours <br />status: <br />Labor: <br />Craft ID Name <br />UL CJE <br />UL DMJ <br />UL MME <br />HEO WMF <br />llaterials : <br />ID <br />BOX000065547 <br />BUSH34118547 <br />BUSH36065047 <br />COUP34004447 <br />COUP34142747 <br />COUP38007447 <br />EL7,034104247 <br />METE36089447 <br />NIPP34131247 <br />NIPP34144147 <br />SETT34146547 <br />Vehicles: <br />ID <br />V2156 <br />CONVERT 3301 GRAND <br />Activity 675 <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />CASE, JAMES E. <br />DOUCETTE, MARK J <br />MURRAY, MATHEW E. <br />WELLMAN, MARK F. <br />Description <br />Planned Hrs <br />HOX METER CONC W/STEEL LID <br />BUSHING 1" X 3/4" BRASS ^ <br />BUSiiING 2" X 1" BRASS ^ <br />COUPLING 3/4" HIP X COP @ <br />COUPLING 3/4" CTS COMP X MIPT@ <br />COUPLING COMP 2" FIP X CTS @ <br />ELL 3/4" 90 DEG STREET BRASS ^ <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />NIPPLE 3/4" CLOSE BRASS ^ <br />NIPPLE 3/4^ X 2" SRASS ^ <br />SETTER COP 5/8" X 3/4" (H9") <br />Description <br />89 DODGE 1 TON <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />8.00 <br />8.00 <br />8.00 <br />2.00 <br />Total Labor Cost: <br />Cost <br />126.24 <br />126.24 <br />110.72 <br />40.74 <br />403.94 <br />Date ,� Used Cost <br />------ -------- ------- <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />12/31/1997 <br />1 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Hours <br />8.00 <br />Total Vehicle Cost: <br />Cost <br />40.80 <br />40.80 <br />44.94 <br />1.09 <br />4.16 <br />3.59 <br />4.09 <br />19.82 <br />1.62 <br />30.67 <br />0.78 <br />1.04 <br />41.41 <br />153.21 <br />