Laserfiche WebLink
INSPECTlON REPORT <br />Address 3�� � ��� ^�� <br />Contractor G' `�` � �l�� <br />Owner <br />Date �' q— 9� <br />U PARTIAL APPROVAL <br />U'VIOLATION U CORRECTION REQUESTED <br />u Corrections Gsted below MUST BE MADE belore work can be approved. <br />U Please contact inspector and arrange lor appointment. <br />U Was not able to perform inspec�ion. <br />J CALL 259-8810 FOR REINSPECTION — 24 haur notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />C! ,ZS. <br />U Temp. Elect. <br />J Footing <br />J Foundation <br />J Duciwork <br />J Wood Stove <br />'J Masonry <br />J BLDG: Pmt. No. <br />TYPE OF INSPE�ION FEQUESTED � <br />U Framing 7 Gas Piping <br />J Drywall, Nailing J Consultation <br />JShearNailing 9�Groundwork�'�—f�S� <br />J Grid J SirucL Slab --� <br />J Rough�in J Final <br />J Service J Insulation <br />L_i Olher <br />J ELEC: Prnt. No. __ <br />J MECH: Pm�. No. _ <br />� PL6G: Pmt. No..- �'� SF' __-- <br />