Laserfiche WebLink
�n <br />V, INSPECTION REPORT X <br />Address <br />Contracts- 1' PLO u, <br />,. <br />al ch iS iv Owner p s� <br />rtr,ht 4 r"Y'Date <br />a J APPROVAL U PARTIAL APPROVAL <br />J VIOLATION 0 CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />Al Please contact inspector and arrange for appointment. <br />ZVas not able to perform inspection. <br />LL 25"810 FOR REINSPECTION - 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />TYPE OF INSPECTION REQUESTED <br />omp. Elect. <br />J Framing <br />J Gas Piping <br />J Footing <br />J Drywall, Nailing <br />J Consultation <br />J Foundation <br />J Shear Nailing <br />J Groundwork <br />J Ductwork <br />J Grid <br />J Shuct. Slab <br />J Wood Stove <br />J Ruagh�in <br />-A Final <br />U Masonry <br />J Semce <br />J Insulation <br />J Other <br />A(BLDG: PmI. No. <br />hq� <br />�)9- SC J MECH: Pmt. No. <br />U ELEC: Pmt. No. U PLED: Pmt. No. <br />