Laserfiche WebLink
PUBLIC WORKS <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-9810 <br />OWNER NAME SOULIER FREDERIC <br />AND ADDRESS. <br />4118 GRAND AVE <br />EVERETT NA 98203 <br />APPLICANT NAME <br />AND ADDRESS. <br />Date 06/17/2003 <br />Public Works Permit M P90306-017 <br />Building Permit x <br />Planning Reference a <br />Public Works Fee S $25.00 <br />Guarantee S <br />PHONE 4252525900 (PHONE <br />TAX PARCEL I.D.6 00596200900800 PROJECTADDRESS. 4118 GRAND AVE <br />DESCRIPTION OF PAVE EXISTING DRIVEMAY <br />PROPOSED WORK: <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800424.5555 <br />4. Pave driveway with a slightdip at area of natural drainage along edge of roadway <br />h4s been <br />eX�eHdz.d �'or <br />/80 days-, ,� L <br />117103 <br />FINAL INSPECTION <br />Approved as Constructed Date <br />07-14-03 <br />3:09PM <br />9 <br />0306017 <br />DRIVE <br />25.00 <br />TOTAL <br />25.00 <br />A OM3661 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />n� <br />MN <br />W <br />O <br />The undersigned ownerlapplicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses. or causes of action that may arse <br />because of installation and maintenance of the improvement or <br />other right-of-way use hereto applied for and er agrees to <br />remove same unotice fro$ the t replace public <br />pr dama§td thereby. ( 1 <br />Signature or Applicant Dale <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />