Laserfiche WebLink
Application For <br />PUBLIC WORKS PERMIT <br />)riot or Type Only <br />Describe Proposed Work _ <br />Address (if known) <br />v,rbi�t war., vnrmn . � � 329 <br />wa. Davr <br />PublIC warn, Fna 5 <br />Torar Faa <br />Lan APPt Fna Pa,C S <br />Dua $ <br />G�(v zlo (7i'rc.ly Cy�lc�T l s2 <br />Marling Address _� City Zip Phone <br />As e-/- <br />Marling Address City Zip Phone <br />four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines •Centerline of street <br />e Outline and dimensions of all existing and a Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259-881 5. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Conetruetion <br />Standards and Specifications. <br />3. Call i-ocatlon Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800.424-5555. <br />AL INSPECTION <br />,roved as Constructed <br />rverett PUBLIC WORKS DEPARTMENT <br />Ever Cedar Street <br />Everett, WA 98201 <br />Phone: 259-881 5 <br />to <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />Uj <br />U) <br />im <br />0 <br />n <br />z <br />0 <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages. costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and replace public property, damsl� thereby. <br />signature of Applicant ware <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />