My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4711 GREELY ST 2018-01-02 MF Import
>
Address Records
>
GREELY ST
>
4711
>
4711 GREELY ST 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:02:41 PM
Creation date
2/20/2017 10:12:37 PM
Metadata
Fields
Template:
Address Document
Street Name
GREELY ST
Street Number
4711
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Address or Site M: / r <br />••••r. pFly ji11u,iueuon in me unsnaaeo areas by checking the appropriate circles. Dlerogard topics <br />that don't describe your building or equipment. DO NOT place checks in the two left columns. Your Plan <br />Reviewer will check the circles in the 'Compliance Required' column, and the field inspector will use the <br />'Inspection Approved' column to check off items as they are correctly completed. This checklist is designed to <br />be used in conjunction with the Window and Door Schedules plus either the Prescriptive Options or the <br />Chapter 5 Qualcation forms. It may also be used with a WATTSUN analysis. <br />PHASE <br />Q Q 1. Slab Insulation (Table 6-2) shall be R-10 and located on the: <br />Q A. Exterior (SEE INSULATION PHASE) <br />Q B. Interior - extending downward from the top slab surface and horizontally <br />under the slab for a total distance of 24", or vertically 24". <br />Q C. Other method - not alloured for Prescriptive Options, describe: <br />Q Q 2 Radiant slab insulation (502.1.4.9) shall be R-10 and extend under the <br />Q Q 3. Below -grade masonry wall insulation (S.502.1.4.10) shall be located on <br />Q A. Exterior and rated R-10 (See insulation Phase) <br />Q B. Interior (See insulation Phase) <br />Q C Other method - not allamed for Prescriptive Options, describe: <br />Q 10 1 4. Thermal break(s) R-10 insulation shall be placed in the slab (5.502.1.4.8) between the <br />conditioned and unconditioned spaces checked below, and extend from the top of the slab to the <br />bottom, then underneath toward the conditioned space for a 24". <br />Dwelling/garage Dwellin4p, <br />connected s ice 0 Slab ed and foundation wall <br />Q Q S. Radon requirements (VIAQ S.502.1,and/or 503) shall be met if one of the following is checked:, <br />Q A. Net foundation ventilation area is less than 1 Ft2 per 300 Ft2 of crawl space. <br />Q B. Foundation vents are closable. <br />Q C. Crawl space acts as a supply plenum. <br />Q D. Site is located in a higher radon risk county(Ferry, rry' Okanogan Pend Oreille, Skamania, <br />Stevens, and Wahkial--n) <br />WSEC Foundation Phase Requirements: <br />
The URL can be used to link to this page
Your browser does not support the video tag.