Laserfiche WebLink
r <br />Date � <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Pudic Works Permit a <br />Blaq. Dept. • ¢-- <br />Public Works Fee <br />$ <br />Total Fee <br />Less Appr Fee Paid s <br />Ill Balance Due $ <br />$ C) Ci <br />A <br />Zip PhonF. <br />Applicant <br />Mailing Address City <br />Describe Proposed Work <br />4 A Z <br />Project Address (if known) ��� h' �� �� -� <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.881 5. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1.800.424.5555. <br />for <br />FINAL INSFWIIUN l <br />Approved as Constructed v <br />ii <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />EverEverett, WA 98201 <br />Phone: 259-8815 <br />L <br />Date <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />CA <br />Im <br />0 <br />z <br />0 <br />0 <br />a <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />appIted f r a o further agrees to remove same upon notice from the <br />City a - o r plac: public property damaged thereby. <br />;ISTO <br />Signature of Applica ' <br />WORK AUTHORIZED BY THIS PERMIT MUST BE TARTED <br />180 DAYS OF DATE PERMIT IS ISSUED AN EREAFTE <br />BE DILIGENTLY PURSUED TO COMPLETION, THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />..II <br />