My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4704 HARBOR LN 2018-01-02 MF Import
>
Address Records
>
HARBOR LN
>
4704
>
4704 HARBOR LN 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 3:06:50 PM
Creation date
2/20/2017 10:23:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HARBOR LN
Street Number
4704
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br />Geotechnical Engineering Evaluation <br />Anderson Landslide Repairs <br />' <br />4704 Harbor Lane <br />Everett, Washington <br />September 15, 2009 <br />NGA File No. 316909 <br />' <br />Page 21 <br />explorations and also with time. Our report, conclusions, and interpretations should not he construed as a <br />warranty of subsurface conditions. A contingency for unanticipated conditions should be included in the <br />budget and schedule. We recommend that we be retained to review the project plans after they have been <br />developed to determine that recommendations in the report were incorporated into project plans. <br />All people who own or occupy homes on hillsides should r-nlize that landslide movements arc always a <br />possibility. The landowner should periodically inspect the slope, especially after a winter storm. If <br />distress is evident, a geotcchnical engineer should be contacted for advice on remedial/preventative <br />measures. The probability that landsliding will occur is substantially reduced by the proper maintenance <br />of drainage control measures at the site (the runoff from the roofs should be led to an approved discharge <br />point). Therefore, the homeowner should take responsibility for performing such maintenance. <br />Consequently, we recommend that a copy of our report be provided to any future homeowners of the <br />property if the home is sold. <br />NGA will review final plans prior to construction and provide monitoring and consultation services <br />during construction to confirm that the conditions encountered arc consistent with those indicated by the <br />explorations, to provide recommendations for design changes should the conditions revealed during the <br />work differ from those anticipated, and to evaluate whether or not earthwork and foundation installation <br />activities comply with contract plans and specifications. We should be contacted a minimum of one week <br />prior to construction activities and could attend pre -construction meetings if requested. <br />Within the limitations of scope, schedule, and budget, our services have been perfonned in accordance <br />with generally accepted geotcchnical engineering practices in effect in this area at the time this report was <br />prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are <br />a means to identify and reduce the inherent risks to the owner. <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />2-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.