My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4704 HARBOR LN 2018-01-02 MF Import
>
Address Records
>
HARBOR LN
>
4704
>
4704 HARBOR LN 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 3:06:50 PM
Creation date
2/20/2017 10:23:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HARBOR LN
Street Number
4704
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br />From: Khaled Shawish [khals@nelsongeotech com] <br />Sent: Friday, February 05, 2010 9:50 AM <br />To: Kirk Brooks <br />Cc: Dippold, John; Holly Anderson: Bala Dodoye-Alali <br />Subject: RE: Anderson Drainage Plan <br />Kirk, <br />It was brought to my attention that the Ci'y is requiring an NGPA buffer between ;he residence and the shoring wall. In <br />my opinion, 'his requirement will hinder f ie home owners ability to access and maintain the drainagE⢠system and shoring <br />wall. The area between the residence a, id wall should be covered with normal landscaping that would help reduce soil <br />erosion in this area, but at the same time provide ample access to the drains and wall for regular maintenance and <br />emergency repairs. I am available to meet with you on site to discuss this issue and hopefully arrive at decisions that <br />would satisfy the City and address my concerns. <br />Thanks for your time and attention regarding this matter. <br />Khal Shawish, PE <br />Nelson Geotechnical Associates <br />425 486 1669 <br />From: Khaled Shawish <br />Sent: Thursday, December 10, 2009 1:59 PM <br />To: 'kbrooks@ci.everett.wa.us' <br />Cc: 'Dippold, John'; 'Holly Anderson'; Bala Dodoye-Alali <br />Subject: Anderson Drainage Plan <br />Kirk, <br />Attached is our most recent drainage plan for the Anderson site. This plan basically allows us to pick up all of the runoff in <br />a tightline and sending it down to the bottom of the slope. This is now possible because the new owners of the lot below <br />are more cooperative than the previous owner. We are hoping to implement the drainage system as part of the permit for <br />the shoring wall, to avoid any delays. Please let me know if a separate permit is required, thanks <br />Khal <br />
The URL can be used to link to this page
Your browser does not support the video tag.