My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4704 HARBOR LN 2018-01-02 MF Import
>
Address Records
>
HARBOR LN
>
4704
>
4704 HARBOR LN 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 3:06:50 PM
Creation date
2/20/2017 10:23:22 PM
Metadata
Fields
Template:
Address Document
Street Name
HARBOR LN
Street Number
4704
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: <br />03/09/2010 11:13 #302 P.004/007 <br />NELSON <br />GEOTECIINICAL <br />ASSOCIATES, INC <br />FIELD REPORT <br />Project: Anderson Property <br />Owner: Rick and }lolly Anderson <br />Location: Everett, Washington <br />17311 135"' Ave NE 9A-500 Weather: <br />Woodinville, WA 98072 Purpose of <br />(425).486 1669 PAX 481 2510 Visit: <br />Cloudy, 40's <br />File No.: 816909 <br />Date: 02/05/10 <br />Report No: 22 <br />Page: 1 of 2 <br />Wall Installation Monitoring By: BD <br />We visited the site today at the request of Rick and Holly Anderson to observe the removal of the <br />downed trees, installation of erosion control features, and drainage improvements on their property and <br />the adjacent property. <br />Upon arrival, we met with Tim of Ponderosa Pacific. Ile informed us that they had re-routed the main <br />drain pipe on the site and directed it into the catch basin (see site plan). A clean -out was installed in the <br />area behind the wall, to the north of the swimming pool. <br />We also observed that the new 4-inch black corrugated pipe had been placed down the slope in the new <br />easement, and the contractors were beginning to install the level spreader near the toc of the slope. The <br />level spreader will consist of a T-connection at the end of black corrugated pipe, with two 4-inch PVC <br />perforated pipes on tither end of the'['. <br />The contractor will return on Monday to create a bridge -type structure for a low area in the pipe <br />alignment, and finish installing and staking a few areas of the erosion control matting. <br />Attachment: Site plan Signed: <br />�� <br />Distribution: <br />`i �7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.