Laserfiche WebLink
INSPECTION REPORT <br />Date: L Permit: G // 0.2 - ©0 <br />Contractor: <br />Owner: ✓fig O A, <br />IYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑ Temp Service <br />❑ LIFER ground <br />❑feroundwork/Slab <br />❑ Groundwork <br />❑ Footing <br />ugh In <br />1roandwork/Slab <br />Rough In <br />❑ SlablConduit <br />❑ Foundation <br />Ceiling Grid <br />Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑ Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Electrical Final <br />❑ Shear Nailing <br />�G�6 PIPE <br />SITE WORK <br />❑ Root Nailing <br />igh InlService <br />Hot Water Tank <br />El Footing drains <br />❑ Ceiling Grid <br />//��, <br />❑ Refrigeration <br />❑ Rough In <br />❑ Roof drains <br />❑ Building Final <br />❑ Gas Pipe Final <br />❑ HWT Final <br />OTHER OR CONSW.44TION: <br />APPROVAL PARTIAL APPROVAL OF nPPROVAL THIS PERMIT <br />❑ OIF <br />K FOR T.C. ORRECTION REQUESTE a W ❑ <br />❑ OK FOR C.O. VIOLATION <br />❑ UNABLE TO PERFC?M INSPECTION: <br />Inspector: <br />EIR (44091 <br />