My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4812 HARBOR LN 2018-01-02 MF Import
>
Address Records
>
HARBOR LN
>
4812
>
4812 HARBOR LN 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 3:21:03 PM
Creation date
2/20/2017 10:31:03 PM
Metadata
Fields
Template:
Address Document
Street Name
HARBOR LN
Street Number
4812
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Study <br />Mahan Residence <br />4800 Block of Harbor Lane <br />Everett, Washington <br />1.0 PROJECT DESCRIPTION <br />The proposed Mahan Residence is planned to be 7 )rated in an existing single-family residential subdivision in <br />the 48M block of Harbor Lane in Everett, Washington. We understand that the proposed residence will be a <br />three-story, wood -framed structure stepped into the existing natural grade. <br />The lot configuration and building location is shown on the attached Fxploration Location Plan, Figure 2. This <br />plan is based on a drawing prepared by Mead Gilman and Associates, dated October 24, 1998. Driveway access <br />to the site will be from the west side of Harbor Lane. Finish building elevations were not available at the time of <br />our study. However, we understand the structure will be stepped into the native grade with lower foundation <br />walls approaching heights of 12 feet. Also, based on our previous experience with similar structures, we expect <br />that perimeter load -bearing walls will cant' between 2 and 4 kips per lineal foot and that isolated spread footings <br />may carry loads of up to 50 kips. The steep, west -facing slope outside of the building site will be reserved as <br />open space. <br />T'he recommendations contained in the following sections of this report are based on preliminary site <br />development inform-ttion. We should review final design drawings and specifications to verify that our <br />recommendations have been properly interpreted and incorporated into project design. <br />2.0 SCOPE OF WORK <br />On November 13, 1998, we drilled 2 test borings to depths of 14.0 and 10.5 feet below existing surface grades <br />and made a reconnaissance of the immediate area. Using the information obtained from the subsurface <br />exploration and site reconnaissance, we performed analyses to develop preliminary geotechnical <br />recommendations for project design and construction. Specifically, this report addresses the following: <br />• Soil and groundwater conditions <br />• Site preparation and grading <br />• Geologic hazards <br />• Foundation design <br />• Lateral earth pressures <br />• Surface and subsurface drainage <br />• Pavements <br />
The URL can be used to link to this page
Your browser does not support the video tag.