Laserfiche WebLink
� <br />Plan ('heck �9rC49348 <br />September 7, 1995 <br />Page 3 <br />In order for the processing of your applicadon to condnue, it will be necessary co <br />provide the Building Divisio� with two complete new sets of drawings reflecdng the <br />correcdons requested. <br />Upon resubmittal of the drawings, your applicatior. will be given priority and plan <br />review will recommence. <br />All required submittals shall be of sufficient detail and contain sufficient ir�formation to <br />ensure that the proposed structure will be constructed in compliance with all adopted <br />codes. <br />Sincerel , <br />� <br />. Mc 1 <br />Associate Engincer/Building <br />1M:jd:pc197�8 <br />