My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6525 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6525
>
BASE FILE
>
6525 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 11:35:32 AM
Creation date
2/20/2017 10:57:56 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I �/6/97 <br />Ciry of Everett <br />Building & Public Works Division <br />3200 Cedar Street <br />Everett, Washington 98201 <br />Attn: Mr. Wayne Wcntz <br />RE: Intracorp / King Extrusions Revised Traffic Mitigation. <br />Dcar Mc Wentz, <br />I N T R A C O R P <br />:'iank you meeting with mc last week to discuss the rcvised traffic mitigation fees for the King Extrusions <br />Su�1e 3D0 project. Based on our rtieeting, l have requested Transponation Planning & Engineering to provide an <br />update to our 6/I I/97 traffic report to include the incrcased square footage for the King Faciliry. 1 have <br />zso5 seco�e nvenue enclosed this updated information (or your review. <br />Seattle. Washnipton <br />981114473 <br />TePt2061625�9226 <br />far-f2061 625�9133 <br />Dy including the revised King facility, the new total square fomagc for the Tract III site would be 293,000 <br />SP. Using this new square footage for the project. Mark lacobs has recalculared the revised traffic <br />mitigation fee for the entire sitc to be 5217,296.00, or 50.73 per building SF. ( 217,296 / 298,300 =.73) <br />The total squarc footage for the King Extivsion project is 122,500 SF including the office. The revised <br />traffic mitigation far this project, per the TP&E update, would be 589,425 ( 122,500 x.73 = 89,425). Per <br />our meeting you have indicated that the traffic mitigation fee is 5101,259. <br />I am requesting that ihe updared traffic in(ortnation be incotpora�ed in you review and that the traffic <br />mitigation be adjusted accordingly. <br />Thank � ou for your cooperation in ihis matter. If you have any questions, or need any additional <br />infommtion, please do not hesitate to call me (ol (206) 728-4560. <br />Sinccrcly, <br />� � <br />Darrcn Peugh, <br />Project Manager, Intracorp Real Bstatc <br />CC: Mnrk Jacobs, Trnnsporlation Planning R Enginccring. <br />�ilc <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.