My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6525 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6525
>
BASE FILE
>
6525 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 11:35:32 AM
Creation date
2/20/2017 10:57:56 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
208728�SB1 iN7RACORP <br />�004 <br />Mr. Darren Peugh <br />INTRACORP <br />November 5, 1997 <br />Pape - 2 - <br />TRlPS TR/�pJ <br />TIME PERIOD TRIP RA?E ENTERING EXITINQ 70TAL <br />Tract ill + Lots t d 2(ITE 130; 491,300 sq. it.) <br />Avs►ap� T. 4.�D(X) . 705.587 1,59E i,5�19 3,197 <br />W��kdfly (50%) (50'K) <br />AM PYak Hour Ln(� . O.B18 ln(X) a 0.91B 320 7•i �g7 <br />(82%) (t B'K) <br />PM Paak HOur T e[(1.027/X+p.00064)j'' 77 2B9 3B8 <br />(219L) (7g�K) <br />X = 1,000 sq. ft. <br />T = Trips <br />The trip generation ts calculated using the trlp fleneratlon equations rates in tho <br />Institute of tra�sportation Engineers (ITE) Trin Genera ion, Fitth Editian, 1991 for <br />Industrial Park (ITE Land Use Code 130). <br />The total number of PM poak hour trips identified in Seawav Tract �II tri� <br />GoneraUon. Access and MiNaa ton An ivs;s were 352 trips. Aa ahown in the nbove <br />table the new PM peak hour tr(p total is 366. Therefore, the addiNon;il 25,000 sq, ft. <br />of industrial space will incrementally increase the trip generation of the combined <br />Intracorp proJoctc by 14 tripc, <br />Tnt11Tc Impect MroyeNon RequAsmand <br />The S.W. Everett/Paine Field Subarea Plan and EIS Identiiy substantfa{ traRic <br />improvements in the area. The cost of these improvements will be p�aid for by a <br />combination of Public Money and contributions from benefittinp develapments. <br />It is our understandinp that the current fee for development pn�jects is <br />$t,006.00 per PM peak hour trip. The additional 25,000 sq, ft. oi industrial space <br />proposed in the Seawny - Trnct III project le expeoted to yanarato 14 PM paak hour <br />trlps. The calculated trafflc Impact tee is S14,084 ($1,006.00/PM trip x 14 PM irips). <br />Thus, the total fee for the Seaway-Tract III projact is $217,296 (S14,C�84 + 203,212 <br />fram 6/11/97 letter report). <br />E06B9AD).�rr <br />9t'l•j POiFO'd B61-1 •HOH� £416S2990Z-01 CO�II !6. SD nON <br />�pF <br />
The URL can be used to link to this page
Your browser does not support the video tag.