My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6525 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6525
>
BASE FILE
>
6525 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 11:35:32 AM
Creation date
2/20/2017 10:57:56 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6525
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 15, 1997 <br />C . <br />�/6fL/C if�� <br />Ed Minshill <br />Lance Mueller and Associates <br />130 Lakeside N250 <br />Seattle, WA 98121 <br />Subject: Owner. Intracorp <br />Job Address: Hardeson <br />Plan Check No.: 56423 <br />Dear Ed: <br />r" <br />In response to the revision as submitted to ; c ur existing construction permit, your plans have been examined and <br />you are advised that the pertnit is being withheld for the reasons listed below. These comments address building <br />issues only, additional revisions or additions may be required by other departments (such as Utilities, Planning or <br />Fire). All references refer to the 1994 Unifortn Building Code, as amended by the State of Washington and/or <br />Washington State Energy Code 1995 Edition, unless stated otherwise. <br />In order for the processing of Your application to continue, it will be necessary to provide the <br />Building Division with two copies of revisfons reflecting necessary corrections. <br />1. Please provide fuRher information about the future tenants with regard to the smoke and heat vent and <br />high•piled combustible stock requirements of UBC 906.1 and UFC, Article 81. <br />2. Please provide more information to prove compliance with the 95 NREC. Include envelope analysis (if <br />component or system). Insulation will be required to be instalied at the time of the shell construction, <br />not tenant improvements. Please revise the drawings to indicate this. <br />3. Please provide the geotechnical report. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will recommence. <br />All required submittals shall be of suHicient detaii and contain sufficient information to ensure that the proposed <br />structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />i ` �'wv <br />Steve Miller, PE � <br />nsso��, te Engineer <br />SM j+lRlatpy 7� <br />CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 •(425) 257-88C�0 • Fax (425) 257•8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.