Laserfiche WebLink
TO: Gordon Witcher, Bill L.ong <br />FROM: Mary Cunningham �0�( <br />V <br />DATE: October 24, 1997 <br />SUBIECT: Intracorp/King Extcu.:ions Project (SEPA k2697) <br />Fast of Hardeson Road <br />Attached is a revised si�e plan for King Extrusions. The plan was modified to <br />• Provide a 25 foot buffer along the east (Associated Sand and Gravel) property line <br />• Remove patking along the east end of the building <br />• Provide replaced parking along the nonh propetty line and on the southeast end of the building. <br />Please let me know if this plan is acceptable and if it changes any of your previous comments on the <br />proposal. f will issue the Planned Action determination as soon as I hear from you. <br />Note to Gordon: Wayne provided comments to me modifying the traffic mitigation fee required for <br />this proposal. The previous fee was based on their traffic study, which proposed development of the <br />entire lot with 3 buildings. Their revised application was for a binding site plan creating 3 lots and <br />development on the nonhern lot only, but they never revised the traffic study. The building on the <br />nonhern lot is much larger than proposed in the traffic study also (122,500 vs. 9'1,500). Wayne <br />revised the fee to $101,259. <br />a <br />� <br />,� <br />