Laserfiche WebLink
07/26/2009 04:15 28144673/91 ( PAGE 02/02 <br />l \ <br />ECLIPSE <br />E�GI�IEER�I�1G I�1�. <br />IJ70q I:. Nc)RA SI'I�KANP. V�LI.L•Y. WA �>�121G <br />�UIT� II WWW.f:Cl.lf'SF-I:NGINF.[RINI�.LC�M <br />I'IL• 1ip91 ��;'.l•77i1 FAX: LiO�)1'1'LI•S7pq <br />Structural Clarification Item #1 <br />Date: <br />Project: <br />To: <br />From: <br />C: <br />Re: <br />June a0, 2009 <br />Carte� Oenenl ConMacting <br />Meuanine <br />�verett, Washington <br />Material Steragc Systems, Inc. <br />8827 Will Clayton Parkway <br />Humble. Texas 77$38 <br />Brian Hanson, P.E. <br />none <br />Mezzanine Bracing Options. <br />1��'� C,7-f��� k� <br />m <br />Reference the meuanine drawings and calculations stamped and signed on <br />7/23/09 tor the followfng clarification item. <br />1) As shown on the drawings the meuanine shall be braaed on grid 1 in two <br />locations. The bracing shail be between grids B and C, and between either <br />grids A and B, or C and D. <br />Please call with any specific questions. <br />Attachment: none <br />END OF STRUCTURAL CLARIFICATION ITEM #1 <br />