Laserfiche WebLink
September 9, 1999 <br />. �. <br />����w� <br />Joe Workman <br />CNA Architecture <br />777 — 108°i Ave., N.E. /i400 <br />Bellewe WA 98004 <br />Subject Project: <br />Job Address: <br />Plan Check No. <br />Dear Mr. Workman: <br />Intracorp <br />6605 Hardsson Rd <br />B9908 - 061 <br />In response to your application for a construction permit, your plans have been examined and you <br />are advised that the issuance of a permit is being withheld for the reasons listed below. These <br />comments address building issues only. Additional revisions or additions may be required by � <br />other departments (such as Utilities, Planning or Fire). All references refer to the 1994 Uniform <br />Building Code, as amended by the Stau of Washington and/or Washington State Energy Code <br />1994 Edition, unless stated otherwise. <br />In order for the processing of your applicatlon to continue, it will be necessary to provide <br />the Build[ng Division with two complete new sets of drawings retlecting the rnrrections <br />requested. <br />Two exits aze required from the second level pc:r UBC 1004.2.3.2. <br />Upon resubmital of the drawings, your application will be given priority acid plan review will <br />commence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, , ' <br />_ .���_= �ti.��- <br />Steve Miller <br />Assuciate Enginar, P.E. <br />SM:jtb9908-06� <br />CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 •(425) 257-8800 • Fax (425) 257-8856 <br />i� <br />