My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6707 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
6707
>
BASE FILE
>
6707 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2017 9:39:01 AM
Creation date
2/20/2017 11:17:51 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
6707
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4` � , <br />� �1�. �� � <br />��i�111�1r��! � <br />�CtObef 31, 200G <br />Intracorp <br />2505 Second Avenue, Suite 300 <br />Seattle, Washington 98121-1473 <br />Attention: Mr. Bill Foster <br />Earth Consultants Inc. <br />ti�nnnu �nantirs. av,ws • �uNm�uir,uai ti.,,n�s <br />Su6ject: Summary Letter • <br />Coastrucdon Monhorinp S.rvicea <br />Soaway Traet 111, l.ot 2, Buildinp 28 <br />Hardeson Ro�d and 76� Straet Southwsst <br />Everett, Wa�hington <br />Reference: Earth Consultants, Inc. <br />Geotechnical Engineering Study <br />E-3592-630, dated September 29, 1998 <br />Earth Consuhants, Inc. <br />Surcharge Release l.etter <br />E-3592-630, dated January 1 �, 2000 <br />Dear Mr. Foster: <br />E•3692-721 <br />As requested, we have prepared this letter summarizing our construcdon monitor(ng <br />services at the subject site. Our services included providing on-site obsenrations, <br />performing field density tests, and providing the necessary laboratory tests on fill samples <br />as required for foundation bearing soils and buildinp area fill. We previously prepared the <br />referenced geotechnical engineering study a�d surcharge release letter for this project. <br />During grading operations, our representatives were on-s(te on a pan-time basis. Between <br />October 21, 1999 and January 13, 2000 our representatives made a total of seven site <br />vishs. During this period, eleven (11) field density tests were conducted on the fill. Our <br />field density tesu were performed in accordance with ASTM Test Designation D-2922 <br />(Nuclear Geuge Methodl. One representative soil samples was returned to our laboratory <br />for maximum dry density tests in accordane` with ASTM D-1557-91 IModified Proctor►. <br />eased on the results of our tests, the structural fill at our test locations was adequacely <br />compacted to the requirements ot structural fili. <br />1805 -13c:9 Pk_� \.c., Sc:ta 201, Belle�te.11'ds`�ingtai 9e0�5 BeHevuE (c25} 6i�318;1 FAX (425) i46-0960 Tcll free (8�; 73�70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.