My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
7000
>
7000 HARDESON RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 4:02:56 PM
Creation date
2/20/2017 11:24:25 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
lC lb l9 U W li f j j <br />Public Works Dep winago <br />Vd I <br />Utilities Dhbk►a, 32" cedar 8&w <br />COST ESTIMATE SHEET <br />AUG 131999 <br />Everett, Washington 9WI <br />(423) 2 4111118 <br />Receipt # /�yS777 <br />.................... ..... ........_...................... <br />CITY OF EVERETT <br />Engumering/Public Services <br />Dan Paid /d -3 <br />If Cost of Work Order <br />10,416.00 <br />Work Order # <br />Cost of Service Order <br />Service Order # <br />Contact Person <br />Telephone # <br />Requested By Gordon Witcher <br />Date of Request 84-99 <br />Property Owner (name) <br />r-boISUCS OF <br />&Xr)ten <br />Charge Cost to (name if different than owner) CSR America, Inc <br />Address PO Box 2037 <br />City Everett <br />Zip 98203 <br />Installation Location Hardeson Rd & Shuksan Way (new road) <br />Installation type/description/size/etc. <br />4*41rhot tap and final connection. Saw cut Hardeson, trench <br />and expose 16", hot tap, install control valve and 40' (t)16" DI pipe. <br />Make final connection afbr pulpy <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Utilities Division 10 <br />advance <br />date to <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative cosh, the deficit shall be charged to the property for which such Installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the Installation. <br />`Deposit most be paid prior to ordering parts or scheduling work. <br />WATER MEME3'AND LARGER MAYHAVEA SJCTO 10 WEEK LEA D TIME. <br />Material ` 4,926.00 <br />Labor and Benefits 4,060.00 <br />Equipment Rental 1,440.00 <br />TOTAL $10,416.00 <br />Prepared by: Ger Crux ate• <br />Accepted by: <br />840-99 <br />cc: jilamakcater t. <br />Clair O6vas <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Representing: <br />CefrAGND-Cn(C IM) <br />
The URL can be used to link to this page
Your browser does not support the video tag.