Laserfiche WebLink
nrnawn tw snow n4nzaR "POST f ) 0 11 J( b <br />Total Utility Maintenance Management System <br />12/16/1996 Page 1 <br />asaxaaaxaaxassasasassasassaaxsassass•sssssssaaassssassssssssssasasssssssasassassa <br />Date Range :01/09/1989 - 12/12/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101196649055 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />sssssssssssssssssssasaasaxxxccxxxxxxaxxaaaxxxxxasssssnss:sssssasaasssssssa�ssass <br />CM WORK ORDER ID: 7101196649055 Title: SO 8 INCH 7000 HARDESON RC <br />Item ID: -- <br />Location ID: <br />Program 710 Function 119 Activity 664 <br />Date Completed: 09/05/1996 <br />Overall Craft: <br />Issued: 08/20/1996 Issued <br />by: GJ Assigned to: <br />Out of Service? NO Priority: <br />Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />Planned Hrs Actual Hrs <br />--------------------- ---------- <br />Cost <br />----- ------ ------------------------------ <br />LUSW RJW RICE, JAMES W. <br />0.00 1.50 <br />33.29 <br />Total Labor Cost: <br />33.29 <br />Materials: <br />ID Description <br />Date # Used <br />---------------- <br />Cost <br />---------- <br />------------ ------------------------------ <br />METE34141847 METER 5/8" X 3/4" NEPTUNE 09/05/1996 1 <br />87.53 <br />Total Material Cost: <br />r87.53Vehicles: <br />ID Description <br />Hours Cost <br />---------------- <br />------------ ------------------------------ <br />V2084 91 GMC PICKUP 1/2 TON <br />1.50 8.40 <br />Total Vehicle Cost: 8.40 <br />Work Description: <br />------------------------------------------------------------ <br />COMMUNITY TRANSIT FINAL CONNECTION <br />METER# 41511210 FOR BYPASS <br />CONTRACTOR DID WORK. CITY INSTALLED METER ONLY <br />Total cost for work order 7101196649055: 129.22 <br />