Laserfiche WebLink
Stormwater Detention Agreement <br />May 16, 1996 <br />Page Two (2) <br />AGREEMENT <br />1. Intracorp agrees to design, obtain permits for and construct on either Lot 3 or Lot 4 a <br />stormwater detention facility which will accommodate a minimum of 0.75 acre feet of <br />storage capacity that will meet all design requirements and satisfy the additional detention <br />requirements for the Property as set forth by the City of Everett and any other review <br />agency ("the Work"). Intracorp will provide Quadrant a copy of the submitted and <br />approved plans for the Work. Intracorp agrees to perform the Work in a timeframe that will <br />not delay the permitting and construction of other improvements on the Property and will <br />complete the Work no later than December 31, 1996 vM(A% T„rttMaW 14 VO*Lt +a <br />ob*K)W P%t tS fv%_-ft, 5, wen tL. Y <br />2. Intracorp will contract for all services and oversee management of the Work, including <br />payment to the parties performing the Work to construct the facility and avoid or cure liens, <br />if any, filed against the Property which are related to the Work. <br />3. Quadrant, or its successors and assigns, will pay Intracorp one-half the cost of the land area <br />and estimated construction improvements to provide a detention pond similar to that shown <br />on attached Exhibit B. It is understood that the actual constructed pond may be a different <br />design and may be part of a larger pond developed by Intracorp at their discretion. <br />Quadrant and Intracorp agreed that the total value of the land area and pond improvements <br />is $100,000, of which Quadrant and Intracorp will share equally in the cost. <br />4. Quadrant or its successors and assigns will make payment of $50,000 to Intracorp upon <br />commencement of construction or August 31, 1996, whichever is later. Said payment will <br />fulfill in total the obligation of Quadrant and its successors and asigns toward the Work. <br />5. If Intracorp has not completed the Work as discussed above, in order that Quadrant's <br />project(s) for Lots 1 and/or 2 not be delayed, Quadrant shall be able to perform the Work <br />on Lot 3 or Lot 4 as applicable at a location approved by Intracorp to the extent that the <br />stormwater detention facility will accommodate Quadrant's project. onies expended by <br />Quadrant in performing the Work shall be deducted from Quadrant'l $50,000 payment. <br />Any residual amount then owing to Intracorp shall then be made to Intracorp upon <br />completion of the Work by Quadrant. <br />40P t+i**' Pram.'+) <br />MRy bL Obf+lu¢a rlr,-44�-5 <br />N404 t- 'N Wf iS a44A4'E +0 %#N <br />