Laserfiche WebLink
JUL 24196 17:01 FR W & H PACIFIC 206 822 5341 ro 12esz5seez9 P.07i09 <br />FdJ <br />June 11, 1996 <br />Mr. Michael Crowson, P.E. <br />W&H Pacific, Inc. <br />3025 1126 Avenue NE <br />PO Box C-97304 <br />Bellevue, WA 99009-9304 <br />RE: Responses to Cky of Everett Commeit on the Compost Storm Water Filter <br />Dear Mike: <br />It is my understanding that there are some issues and concerns regarding the operation of the <br />Type II Compost storm water filter for the Community Transit Maintenance Facility. <br />The first issue is in regard to what kind of warranty CSF Treatment Systems will make u to the <br />operation of the unit. Basically, CSFTS carrot provide a warranty with t aspect to levels of <br />treaunent This is primarily because the exact volumes and pollutant characteristics of the storm <br />water is unknown. However, i can provide testament as a professional engineer that the data <br />presented for the system in the BMP documents submitted to CT are factual and representative of <br />how the system should operate in the field. I should also point out the design engineers do not <br />provide warrantees on the level of treatment of conventional BMPs such as ponds or swale. <br />Our business is water quality treatment Our ftrture relies on customer service, research and <br />development, and providing a quality product. As part of our commitment, we will provide <br />continuing support to the parson(3) providing operations and maintenance to this facility. <br />There are some concerns about the nature of the pollutants being generated on the site. It is my <br />understanding that the primary runoff surfwe is parking lot surface. Assuming that the owner <br />provides periodic sweeping and catch basin maintenance, this facility is appropriately sized. <br />Like any other BMP, source control will enhance the operation and longevity of the filter system. <br />The City of Everett has also provided a set of review comments for the compost filter. Below ate <br />responses to the comments that are supplemental to the BMP document we have submitted for <br />the City's review. <br />A draft O&M Manual for the Type II open unlit is almost complete, upon completion, we will <br />send it to the City. <br />-fi,:s rrranual i5 rehutr,24, per- 4iv 5E1q 11vr Ci �,j reu;ew and typprovaI . <br />E�j <br />07/24/96 16:52 TX/RX N0.0327 P.007 <br />