Laserfiche WebLink
0:;04:e7 13::: PAZ soa 640 8300 QUADRANT CORP .». PtsLrc RUMS ADM 0e02 <br />9. Sturmwater detentionMetenrion, quality Protection. and treatment requirements for tLis project <br />shall be those requirements in effect at the time of application for Public Worsts permit~, except as <br />allowed fur in this document. All normwater facilities should be designed and initially <br />constructed to meet the requirements of all future expansion on the site. If the stornawuw <br />facilities we not designed and constructed initially for all phases of the praject, the standards in <br />effect at the time of application for future building permits for 3uhsequent phases will dctcttnine <br />the soormwater treatment and detention requirements for those phases of the project <br />02/04/97 13:13 TX/RX NO.0445 P.002 <br />