Laserfiche WebLink
021104 P7 13:13 FAX 206 040 8300 <br />QUADRANT CORP <br />+.. PtMLIC WORKS ADM <br />Stonnwater Detention Agreement <br />May 16, 1996 <br />Page Two (2) <br />AGREKNUNT <br />1, Iutracorp agrees to design_ obtain permits for and construct on either Lot 3 or Lot 4 a <br />stormwater detention facility which will accommodate a minimum of 0.75 aam feet of <br />storage capacity that will meet all design requirements and satisfy the additional detention <br />requirements for the Prop" as set forth by the City of Everett and any other review <br />agency ("the Work"). Intracorp will provide Quadrant a copy of the submitted and <br />approved plant for the Work. Intracorp agrees to perform the Work in a timeframe that will <br />not delay the permitting and construction of other improvements on the Property and will <br />complete the Work no later than December 31, 1996 aMth»s Pf"tlp fiw tNiS w"s-. 'vN S u.+lllrt +o <br />2. Intracorp will contract for all services and oversee management of the Work, inchtdins <br />payment to the parties performing the Work to construct the facility and avoid or cure liens, <br />if any, filed against the Property which are related to the Work. <br />Quadrant, or its successors and assigns, will pay Intracorp one-half the cost of the land area <br />and estimated construction improvements to provide a detention pond similar to that shown <br />on attached Lxhibit B. It is understood that the actual constructed pond may be a diffimat <br />design and may be part of a larger pond developed by Intracorp at their discretion. <br />Quadrant and Intracorp agreed that the total value of the land area and pond improvements <br />is SI00,0o0, of which Quadrant and Intracorp will sham equally in the cost. <br />4. Quadrant or its successors and assigns will make payment of $50.000 to Intracap upon <br />commencement of construction or August 31, 1996, whichever is later. Said payment will <br />ftilffll in total the obligation of Quadrant and its successors and asigns toward the Work. <br />5. If Intracorp has not completed the Work w discussed above, in order that Quadrant's <br />project(s) fbr Lots I and/or 2 net be delayed, Quadrant shall be able to perform the Work <br />on Lot 3 or Lot 4 as applicable at a location approved by Intracorp to the extent that the <br />ctormwater detention facility will accommodate Quadrant's proj ones expended by <br />Quadrant in performing the Work shall be deducted from Qua9=dc <br />$50,000 payment. <br />Anv residual amount then owing to Intracorp shall then be to Intracorp upon <br />completion of the Work by Quadrant. <br />400 PMt`°r PMMrn` }f <br />Naews- ~ i4 VJ4008W i» bald <br />02/04/97 15:13 TX/RX N0.0445 P.005 <br />