My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
7000
>
7000 HARDESON RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 4:02:56 PM
Creation date
2/20/2017 11:24:25 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1115 main street, suite 100 wattle, washington 98104-2540 <br />(206)224-MI faxQM) 2249M <br />www.otak.com <br />October 25, 2004 <br />Qoy l f - ofs <br />Dan Jerome, Capital Facilities Planner <br />Community Transit <br />7100 Hardeson Road <br />Everett, WA 98203 <br />Re. Merrill Creek Operations Building <br />HK Secured Storage Floor Loading for Mobile File System <br />Community Transit Purchase Order No. CTRNS-0000007139 <br />-- Otak Project No. 30123.027 <br />Dear Dan: <br />At your request, we evaluated the existing floor structural system of the Merrill Creek <br />Operations building at the Human Resources Socured Storage area. We understand <br />that a new file storage system is being considered at this location and we were asked to <br />verify if the existing floor system is structurally adequate to support the specified <br />loading. <br />We have reviewed the building plans prepared by Lance Mueller 8c Associates provided <br />to us by Community Transit. The existing floor system consists of Steel Joists and 4- <br />inch floor slab on 20-gage metal deck. The structural plans specified that the floor was <br />designed for 100 pounds per square -foot of live load. <br />The proposed file storage system layout, Design 6159.3A, prepared by SNW, indicates <br />that the total estimated loading of the system is 94 pounds per square -foot, which is <br />slightly under the specified allowable live load for the floor. Based on our evaluation of <br />the structural floor system (i.e., floor slab on metal deck and steel joist framing) and the <br />information on the original building plans, it is our opinion that the floor is capable of <br />supporting a new file storage system as proposed. <br />Should you have further questions or need additional information, please call me at (206) <br />442-1380 or email me tit keoin.kim@otok.com. <br />Sincerely, <br />Ot Inc. ` <br />Kevin Kim, PE, SE <br />Senior Project Manager <br />c: Project file 30123.027 - Otak <br />&�rnrject\]ollp�sol'JJ\Txak Yr nwr &r R.rUdmin�C n+r�.lnms•1o256u.drv: <br />creativity. integrity. and skill ;;n:ngttening our communities perfmmirgexdtingwork • semngourclimts <br />
The URL can be used to link to this page
Your browser does not support the video tag.