Laserfiche WebLink
'UBL/L WORKS <br />December 10, 2014 <br />Mike Warren <br />Mike.warren(a)com mtrans.org <br />RE: Owner: Snohomish County PTBA <br />Job Address: 7000 Hardeson Rd <br />Plan Check No: B1412-011 <br />Dear Mike, <br />In response to your application for a construction permit, your plans have been examined and you are <br />advised that revisions may be necessary before a permit can be issued. Please review and respond to the <br />comments below. These comments address building issues only. Additional revisions or additions may be <br />required by other departments (such as Utilities, Planning or Fire). All references refer to the 2012 <br />International Building Code (IBC), the 2012 International Fire Code (IFC), the 2012 International <br />Mechanical Code (IMC), and the 2012 International Energy Conservation (IECC), as amended by the <br />State of Washington and adopted by the city of Everett. The current IBC referenced standard for <br />accessible design is the 2009 "Accessible and Usable Buildings and Facilities"(ICC/ANSI At 17.1). Federal <br />ADA regulations and standards may be more restrictive. <br />In order for the processing of your application to continue, it will be necessary to provide the <br />Building Division with two complete new sets of construction documents reflecting the <br />corrections requested. <br />1. IBC 1103.1 requires the building to be accessible. <br />If you have any questions, please call me at 425-257-7264. <br />Upon submittal of the drawings, your application will be given priority and plan reviews will recommence. <br />All required submittals shall be sufficient detail and contain sufficient information to ensure that the <br />proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />Steve Miller <br />Associate Engineer <br />CITY OF EVERETT • 3200 Cedar Street • Everett. WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />