My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7000 HARDESON RD 2018-01-02 MF Import
>
Address Records
>
HARDESON RD
>
7000
>
7000 HARDESON RD 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 4:02:56 PM
Creation date
2/20/2017 11:24:25 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7000
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
472
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_.r <br />COST ESTIMATE SHEET <br />Receipt # <br />Cost of Work Order <br />FD <br />i <br />+�1 <br />OCT %3 i 1-997 S <br />CITY OF EVERETT <br />Public Works Dept. <br />X Cost of Service Order 1,964.00 <br />Contact Person Heidi Berger -Hansen <br />Requested By Gordon Witcher <br />Property Owner (name) Community Transit <br />Charge Cost to (name if different than owner) <br />Address 1133 164th St SW <br />Installation Location 7000 Hardeson Rd <br />City Lynnwood <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Everett, Washington 99201 <br />(425)257-8809 <br />Date Paid _ //- -7 <br />Work Order # <br />Service Order # <br />Telephone # '425) 348-7135 <br />Date of Request 10-27-97 <br />Zip 98037 <br />Installation type/description/size/etc. 8" connection. Expose existing stub, add gate valve for hydrant, make final <br />connection after purity. Install DCDA meter and remote hook up. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />rl The following estimate is based upon the Street Division work group providing all labor, equipment, <br />materials and restoration to property. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation date to <br />allow for scheduline and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />Itemized Cost Estimate: <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />TOTAL. <br />Prepared by: <br />Accepted by: <br />CGSTAGW Ga inonu,ia_aAo� <br />864.00 <br />756.00 <br />344.00 <br />S1,964.00 <br />Crum Date Est. <br />i <br />Prepared: <br />10-29-97 <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Cnun <br />Alan Locke <br />Representing: <br />IN <br />
The URL can be used to link to this page
Your browser does not support the video tag.