Laserfiche WebLink
� <br />NOTICE OF CflMPLETE APPLICATTON <br />t and <br />PLANNED ACTION DETEItMINATION <br />SEPA �f46-97 SPU lII k2-97 <br />Community Tra�uit Administrative Offices <br />August 18, 1997 <br />Proposal: Construction of a 26.000 sf adtni�.istration building for Community Transit. A day <br />care may be consmtcted on the lot in the future, but is not part of the cucrent application. Memll <br />and Ring Creek runs along the eastern portion of the property. Access will be taken from an <br />eristing bridge crossing. A stream crossing for utilities may be required if connection to existing <br />on-site utilities is not feasibl�. <br />Proponent: <br />Locatioo: <br />Size: <br />Zoning: <br />General Plan: <br />i,ead Agency: <br />Contact Person: <br />Community Transit <br />l 133 - 164th St. SW <br />Lynnwood, WA 98037 <br />7000 Hazdeson Road <br />Total parcel is 29.8 acres <br />M-2 <br />5.1 Heavy Industrial <br />Ciry of Everett Planning Department <br />Mary Cunningham Phone: 257-8731 <br />The Cicy of Everett Planning and Community Development Di[ector has determined that: <br />• The projec[ is located within the boundaries of the Southwesc Everett Subarea Plan. <br />• The zomng designation of the property upon which the project is proposed is consistent <br />with those designations analyzed in the Southwest Everett/Paine Field Subarea Plan and <br />EIS, December 1996. <br />• The proposed use is consistent with the uses and intensities allowed in the City's <br />development regulations and is listed as a use analyzed in the final EIS, Tables 3.1-1 and <br />3.1-2. <br />. The projec[ is a use that implements the Subarea Plan and the project's significant <br />environmental impacts have been adequately addressed in the SW Everett/Paine Field <br />Subarea Plan EIS. <br />. The project's significant adverse environmentai impacts wip be micigated through the <br />application of the mitigation decision document. These mitigation measures, along with <br />other City requirements and conditions, constitute sufficient m�agation for the significant <br />environmental impacts associated with the proposed projec[. <br />• Th: proposed project must comply with all appl�cable local, state and federal regulations <br />and development standards. <br />• The proposed project is not an essential public faciliry. <br />EXNIII�� <br />o.�-- af.y— <br />