Laserfiche WebLink
� <br />- '�; ,, <br />P <br />.fC;'r,''. 1`•'� • <br />��� <br />b � <br />��� <br />��� <br />�$�� <br />■ <br />K"+ Q <br />o• <br />�y <br />N <br />w <br />N <br />�� <br />�� <br />� <br />i C� <br />I <br />�� <br />i ' <br />CNA Architecture Group <br />12 April 1991 <br />� <br />W-7352 <br />Page 13 <br />5.8 Slope Considerations <br />Based on topography of the existing slope and the preliminary location of the proposed <br />structure, the design considerations tor slope stability can be grouped into three generai <br />areas. First, from the northwest property corner to approximately 600 feet south, the <br />existing slopes appear to be flatter than the recommended 1.5 Horizontal to 1 Vertical <br />(1.5H:1�. Based on this topography and anticipated dense glacial tili soil conditions, we <br />feel it would be possible to cut this slope bacl< to a 1.5H:1V with a 6 foot wide rock lined <br />run-off collection terrace cut at the property line and at 25-foot vertical intervals down <br />slope. From approximately 600 feet to 740 feet south �f the northwest property corner, <br />the existing slopes appear to be steeper than 1.5H:iV. Along this �ortion of the slope, <br />we recommend fill be placed along the slope to achieve a minimum slope angle of <br />1.5H:iV and to accommodate the previously described run-off collection terraces. Fiil <br />placed along the slope would need to be benched 5 feet into the existing slope and each <br />bench should not be more than 5 feet high {as stated in 1986 WSDOT Standard <br />Specification 2-03.3(14)}. <br />From 740 to 1,020 feet south of th2 northwest property corner, the existing slopes range <br />irom iH:iV to near-vertical undercut. Slope heights to the property line for this region <br />range between 12 to 28 feet. We recommend that this portion of the slope have a <br />i.5H:1V fill added to the slope for stabiliry. This fill slope should be built in accordance <br />with previous recommendations for benching and run-off coilection. The addition of this <br />toe-slope would require a setback from the existing slope toe of up to approximately 60 <br />feet. <br />�� <br />Based on the previously discussed options for the slope stabilization, the following pes <br />of retaining structures would be feasible for cuts made in the toe of the slopes. From the <br />1 ,�, northwest property corner to 740 feet south of the property corner, rocl<eries could be <br />�I�! used for cuts of 6 feet or less. Cuts into the slope greater than 6 feet in height would <br />- require a more rigid retaining structure such as a cast-in-place or precast crib-lock wall. <br />For the area beriveen 740 to 1,020 feet south of the property corner, retaining of sloping <br />fills could utiiize cast-in-place concrete, precast criblock, or a keystone wall. As designs <br />are finalized for this project, we will be glad to provide additional information and criteria <br />for the above recommended retaining structures. <br />