My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7200 HARDESON RD 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7200
>
7200 HARDESON RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 11:38:11 AM
Creation date
2/20/2017 11:36:39 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7200
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � �� <br />Slope Stability, Erosion and Landslide Hazard <br />The stream is not ad.jacent to significant slopes, so slope stability and landslide <br />hszards are not considered issues. <br />Seismic Hazards <br />No seismic hazards are known to exist on the site relative to the st:eam corridor. <br />The development will have no significant impact on seismic hvards relativc ro the stream. <br />Strcams <br />'fhe City of Everctt ha�c classified the sitc as an environmentally sensitive area based <br />on the presencc of Merriil and Ring Creek (Strcam Category lll). <br />This report was prcpared in accordance with the rcquircments of Section 37 of the <br />Everett Zoning Codc to describe actions proposed to restore and protect the stream. <br />Restorntion Plan Overview <br />The report presents a two-phase plan for relocation ana restoration at a�proximately <br />3,050 feet of Merrill and Ring Crcek, which is in a degradcd condition �nd ::ucs not suppon <br />fish in the reach aJjacent to the subject property (Figure 1). The new alisnment would <br />allow the channel to connect to the existing �nlet structure to the regional de�:ntion pond. <br />Phase 1 would relocate approximately 1,800 feet of existing clianncl, beginning <br />approximately 75 feet south of the property and extending north to an �xisting culvert <br />(Figure 2), by eaily fall of 1990. Vhaze 2 would relocate th� remaining 1,250 feet of strcam <br />after completion of gravel mining, and is tentatively scheduled f�r the summer of 1991. <br />�= Approximately 800 to 900 feet of stream channel within the Phase 2 section flows <br />through a vegetated corridor, and relocation of this reach will take place as part of the <br />�� continued mining operation. For this report, it is assumed that Phase 2 of the restoration <br />�� project would be implemented after completion of gravel mining. <br />� <br />Bascline Information <br />ea <br />�, Baseline intormation pertaining to Merrill and Ring Creek and Ihe site was gathered <br />,,,, by review of existing documenu and site visits during July 1990 uy JSA staif. The primary <br />document used to prepare this section was the "South Everett Drainage Basins Plan for <br />�� Basin Number 5, Merrill and Ring Crcek", prepared by Broam and Caldwell and the City <br />i.. of Everett. <br />� <br />� <br />a <br />b <br />
The URL can be used to link to this page
Your browser does not support the video tag.