Laserfiche WebLink
� <br />� <br />' CNA Architecture Group <br />12 i.pril 1991 <br />W-7352 <br />Page 2 . <br />This summary is presented for introductory purposes only, and should be used in <br />conjunction with the full text of this report. The project description, site conditions and <br />our de�ailed design recommendations are presented in the text of the report. The <br />exploration procedures and detailed exploration logs are presented in Appendix A. <br />Laboratory testing procedures and results are contained in Appendix e. <br />2.0 PROJECT DESCRIPTION <br />The project site is in the southern portion of the former Merrill Creek Gravel Pit.located <br />west of Hardey�on Road and north of 75th Street S.W., in Everett, Washington. The site <br />is a rectangular shaped 9.4 acre lot, with approximately 1,000 feet of frontage along <br />Harder,r�on Road by 540 feet to the west. The site topography is relatively flat with a <br />gernle upward slope to the south and a high steep slope bordering the site to the west. <br />There is an approximately 10 foot deep by � foot across stream channel which parallels <br />Hardepson Road on the east margin of the property. <br />, 115�� <br />The proposed projec includes the construction of a single building with a total of <br />approximat�:ly 5,0000 quare feet of building area. We understand the building to be a <br />tiltup conc��te wall structure with slab-on-grade concrete floors. Accessory paved <br />parking and tra�c areas would service the complex. Primary use would be for a <br />commercial laundry, with large washers and related equipment. <br />The purpose of this study v+as to establish general subsurface conditions at the site from <br />which conclusions and recommendations for foundation design and construction for the <br />project could'be formulated. The scope of work consisted of a field exploration <br />program, geotechnical engineering analyses, and report preparation. In the event of any <br />changes in the nature, design, or location of the facilities, the conclusions and <br />recommendations contained in this report should be reviewed and modified if necessary <br />to reflect the changes. This report has been prepared for the exclusive use of CNA <br />Architecture Group, Overall Laundry Service, Inc., and their agents, for specific <br />application to this project in accordance with generally accepted geotechnical <br />engineering practices. <br />