My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7200 HARDESON RD 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7200
>
7200 HARDESON RD 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2017 11:38:11 AM
Creation date
2/20/2017 11:36:39 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7200
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�' <br />� <br />I _- <br />r <br />rr <br />Live Slakes <br />�. In those areas where live stakes are intended to provide bank stability, 75 percent <br />survival at the densities outlined in the plans is required at the end of the second year. <br />Initial installation densities will exceed the plan densities; therefore, the presence of small- <br />^� scale mortality would not likely cause a failure of the performance standard. <br />"'a Other Vegetation <br />, Other planted woody vegctation or seeded areas must have either 75 percent sun+ival <br />`� or 75 percent rnverage, respectively, the first fall after planting. For woody vegetation, if <br />�, survival is less than 75 percent, replanting would be conducted with a different species. <br />!n terms of wetlands performance standards, attainment of 75 percent survival or <br />coverage in the corridor would insure that wetland functions have been replaced. <br />Conlingency Plxn <br />If monitoring indicates that certain elements have. failed the performance standards, <br />replacement would occur early that fall. Any replacement features would be monitored at <br />least the spring following installation. <br />Performance Bond <br />The project proponent would post a performance bond for this project. The terms <br />and value of the bond would be negotiated between the City of Everett and the project <br />proponent. <br />I� <br />'.."i <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.