Laserfiche WebLink
2. \'1'hcn maintaining corzidors for aboveground lincs ncar environmcntally sensitivc arcas, to the cxtent <br />fcasiblc, thc PUD shall leeve cut trec stumps as snags for wildlife. 7�he corridors must be rcplanted �vith <br />nati��c specics that will not grow high cnough to impact thc lincs. (SBPA Ylant and Animal Policics) <br />Section 7: F.NVII20NMF.NTAL HF,ALTH <br />7.1 NOIS1; <br />7.1.1 Threshnld <br />All dcaclopmrnt ir I•:�'c:cu must hr in c�mfi,nu;�nrc �cilh thc rcquirctnrnts u� I�.�1(' �U.UB. thc Noisc Control <br />Ordinancc. Noisc studics» my Uc rcyuircd to dctrrminc if a pruposal is in confbrma�uc nith thc ordinancc. <br />7.1.3 nlitigation nlcasures <br />Nonc <br />7.2'1'O\IC/IIA"I.AItUOUS MA7'F,It1ALS ANU EXI'LOti1VF.5 <br />7.2.3 Mitigalion Mcasures <br />Construction Phasc <br />Constructirin cquipmcnl and �•chicics must Uc m,iintaincd so thcy do not Icak fucls or lubricants. During <br />constniction, a staging arca must bc spccificd for all vchicic maintcnancc acti��ities. Tlic staging arca <br />must Uc locatcd wcll away from all drainagc courses. V1'hcre possible, all stornnvatcr from rclated <br />mainlcnancc arcas must bc dircctcd to thc sanitary scwcr, rathcr lhan thc storni���atcr systcm. (SEPA <br />Larlh, �Vatcr and I:nviroumcntal I Icalth Policics) <br />2. During construction activitics. all spills of fucl and hn-r.ardous matcrials must bc containcd and remo�cd <br />in such a manncr as to prc��ent thcir entcring the �valers and soils of the Statc. Clcanup of spills must <br />tnke pmcedence o��er oAier ��rork on site. (SI�.YA L'arth, \Vater and Lnvironmental }[ealth Policies) <br />3. lluring constniction, all pctrolcum products, chcmicals, and building matcrials that could contaminate <br />runoff must bc slored in a lincd coecred ama. An impervious benn must be constructed azound the <br />perimctcr of the storage arca. "fhe storage are� must bc locatcd a��ay from cn��ironmentally sensiti��c <br />aroas. (SI:Pn l:,u'th. \'1'atcr and lim�ironmcntal licalth Volicics) <br />Oncration Phasc <br />d. Dumpstcrs must bc co��crcd and maintaincd, so that storm���atcr runotT from rcfuse docs not cntcr stonn <br />drains or inliltraic into soil. (SGPA Garth, Watcr and rnvironmental licalth Policies) <br />5. All chcmicals or products of a ha�ardous or to�ic naturo that may be used or sturcd on the site musl be <br />siorcd undcr corcr and isolatcd from thc storm drainagc systcm. (SEYA Earth Watcr and Environmental <br />I lcalth Policics) <br />