My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7405 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7405
>
BASE FILE
>
7405 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 9:46:15 PM
Creation date
2/20/2017 11:44:14 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7405
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Propased Improvements Summary <br />Threc rctail buildinas are proposcd for thc site. Stormwater for thc site will bc collected in a <br />convcntional pipc systcm (scc Shcct 4.0 in Appendis A). Stormwatcr quality trcauncnt will bc <br />provided by a cartridge mcdi:t filler syslcm (Stormfilter'"'). Delention for lhc silc ���iil be <br />providcd in a concretc vault undemcath thc parking lot. 3tormwatcr �ti•ill outfall to an cxistin, <br />3G-inch storm drain linc runnine along lhc north sidc of H,vdcson Road. � <br />Conve ance Design <br />Thc proposed storm drain systcm will convcy surfacc runoff from thc Mowuain Vicw Plaza <br />building roofs, p:u'riing lots, sidcwalks, and landscapc arcas. This storm drain systcm is <br />designcd lo convcy thc 24-hou�', 25-ycar stonn cvcnt, which has a rainfaU dcpth of 2.60 inchcs as <br />defincd in thc COL•' Storni��•arer Alnnagrment D1a�wnL Thc ration:d mcthod was uscd for pipc <br />sizing calculations. A sprcadshcet showing pipc sizc calculations is includcd in Appendix B. <br />Thc pipcs wcre sizcd to convcy thc 25-ycar runoff ���ithout c�ccedin� 90 perccnt capacity. Thc <br />12-inr.h pipc is adcquatc to com�cy thc runoff from thc parking lots and roofs. Thc Zd-inch <br />outf:dl line is sized to convcy the 2S-ycar runoff from �lountain View Plaza plus thc 25-ycar <br />runol7 from fuWrc dcvclopmcnt of Lot 2 to thc north. <br />Detention Design <br />Stonnwatcr ctctcntion (or thc sitc will bc providcd by an undcrground concretc vault. Thc vault <br />is siud match 50 percent of the existing 2-ycar flo��� and 100 percent o( the e�istin; l0 and <br />100-ycar flows per thc COE Srormtirarrr �1lmia� en�cnr ,Umiurd. Calcul:uions arc providcd in <br />rlppcndix B. <br />Water Quality Design <br />A Stormfiltcr'" cartrid,c mcdia filtcr vault will providc ���atcr yuality trcatmcnt for thc paved <br />arcas subjcct to vchicic�uaffic. Storm��atcr will p:iss throu_h thc dctcntion vault to providc <br />prcucaunent of xdimcnts :md trash bcforc cntcring thc 3tormfiltcr'". 'thc filtcis usc a CS� Lcaf <br />m�dia for scdimcnt, oil, solublc mctals, and tolal nutricnt rcmovnl. 1'hc fiitcr is sized to trcat thc <br />discharge fi�om the prin:.ny orifice from the detention vault using the StormfilterT"' Design <br />�Ie�nu:il mass lo:iding method nnd City of F,verett rcquirements for I'ilters located do���nstre.un cf <br />dctcntion. Runoff from builJin� roofs ��•as assumcd to not contrihutc to thc mass loadin�. Sec <br />Appcn�lix [3 for Stormfilter�`� sizing calculations. A I6 x S fuot ��;iult �vith 20 filtcr caru�id�es is <br />rcyuire�l. 'l�hc dctcntion system routin� �cas calculutcJ usin�: thc 5anta I3arb;iru Urban <br />hlounlain Vio-.v Plua May 2J, 2005 <br />Hydraulics Repart � �' <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.