My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7425 HARDESON RD BASE FILE 2016-01-01 MF Import
>
Address Records
>
HARDESON RD
>
7425
>
BASE FILE
>
7425 HARDESON RD BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2017 11:03:58 PM
Creation date
2/20/2017 11:52:59 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7425
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />C9 <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />� <br />, <br />� <br />GEOTECHNICAL ENGINEERING STUDY <br />Trace and Associates <br />July 19, 2005 <br />E-11880 <br />Page 14 <br />The recommendations submitted in this report are based on the data obtained from the <br />test pits. Soil and groundwater conditions between explorations may vary from those <br />encountered, The nature and extent of variations between our exploratory locations <br />may not become evident until construction. If variations do appear, ECI should be <br />requested to reevaluate the recommendations of this report and to modify or verify <br />them in writing prior to proceeding with the construction. <br />Additional Services <br />As the engineering geologist of record, ECI should be retained to perform a general <br />review of the final design and specifications to verify the earthwork and foundation <br />recommendations have been properly interpreted and implemented in the design and in <br />the construction specifications. <br />ECI should also be retained to provide geotechnical engineering services during <br />construction. This is to observe compliance with the design concepts, specifications or <br />recommendations and to facilitate design changes in the event subsurface conditions <br />differ from those anticipated prior to the start of construction. <br />Hanh Consuhants. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.